MODEL L-03 / L-06 UV-finish collection

UV-Finish Lotion Pumps with Gold and Silver-Tone Actuators

Compare five reflective-finish actuator references, with construction notes separated by catalog family.

Product number
L-03 / L-06 UV-finish collection
Collection
UV-Finish Lotion Pumps
Pictured references
5
Reference labels
L3-2, L3-10, L3-5A, L3-15A, L6-2
Construction and finish
See the family-specific notes below; confirm selected assembly
Neck finish and output
Confirm for the selected reference and bottle
MOQ30,000 pcs
Lead time35–45 days
Product description ↓

STYLE COLLECTION · 5 APPEARANCE REFERENCES

Compare the 5 pictured references

Compare each style below and include its reference in your inquiry.

Images have been cleaned up from catalog scans for appearance reference. Confirm the exact finish and construction with physical samples before approval.

PRODUCT DETAILS

Specifications & product description

Specification itemParameter / detail
Model / item no.L-03 / L-06 UV-finish collection
CollectionUV-Finish Lotion Pumps
Pictured references5
Reference labelsL3-2, L3-10, L3-5A, L3-15A, L6-2
Construction and finishSee the family-specific notes below; confirm selected assembly
Neck finish and outputConfirm for the selected reference and bottle
Minimum order30,000 pcs
Lead time35–45 days

Compare the pictured references

The L-03 references include L3-2, L3-10, L3-5A and L3-15A. L3-5A is pictured in gold tones; the other references have silver-tone actuator appearances, and L3-10 contrasts its actuator and upper sleeve with a white collar. L6-2 has a slim silver-tone actuator above an exposed white stem.

Construction and finish selection

The catalog describes L-03 as UV-coated plastic closures/actuators and L-06 as metal-sheathed closures with UV-coated actuators. These constructions are different. Confirm the material and coated surfaces for the selected reference rather than treating a metallic appearance as proof of solid metal.

Confirm bottle fit and dispensing requirements

The supplied page does not specify individual neck finishes, output, lock mechanism or dip-tube length for these pictured references. Send your bottle drawing, intended formula, required output, preferred appearance, quantity and destination. Review physical samples for fit, dispensing, sealing and finish before approving production.

BUYER INFORMATION

Ordering, lead time & samples

MOQ

30,000 pcs

Include the quantity per model, color or finish in your inquiry.

LEAD TIME

35–45 days

Share your delivery schedule and selected configuration with our team.

SAMPLES

Review the fit

Request samples to check dimensions, appearance and performance with your bottle or assembly.

PACKING & FREIGHT

Quote by destination

Tell us your destination and packing requirements. Carton details and freight arrangements are confirmed with your quotation.

PLAN YOUR CONFIGURATION

From product selection to sample approval.

01 / FIT & DIMENSIONS

Confirm the interface

Provide the bottle or component drawing and required dimensions. Nominal size alone does not confirm fit.

02 / APPLICATION

Review your requirements

Share the intended contents, operating requirements and preferred finish. Confirm available options for this model.

03 / SAMPLE APPROVAL

Check the assembly

Review the selected component with your bottle and formula before confirming the order.

Questions before ordering

Does the stated size guarantee compatibility?

Confirm the interface drawing and check samples with your bottle or assembly. Matching a nominal size does not guarantee a compatible fit.

What should I include in a quotation request?

Send the product or model, order quantity, dimensions, intended application, preferred finish and destination market. If a specification is not yet decided, our team can help review it.

What are the MOQ and lead time?

MOQ is 30,000 pcs. Lead time is 35–45 days. Include your required delivery schedule and customization details in your inquiry.

Request a quote or samples

Share your requirements so we can review the right configuration. You can also email [email protected].

Product: UV-Finish Lotion Pumps

Add purchasing details (optional)

MOQ: 30,000 pcs. Lead time: 35–45 days. Please tell us if you need samples before ordering. Fields marked * are required.