SPECIFICATIONS · SAMPLE APPROVAL · INSPECTION

Define the requirements.
Check the details.

Quality starts with an agreed specification. Review your component, bottle and formula together, then confirm the checks and documents your order requires.

Our team coordinates requirements with a manufacturing partner. Inspection scope depends on the selected product and configuration; agree the details for your order before production.

Injection molding workshop at STDPAK’s manufacturing partner facility
Manufacturing partner facility · STDPAK project support
Standard minimum order30,000 pcs
Production lead time35–45 days
Printed tinplate lids100,000 pcs MOQ
Before productionConfirm fit & samples

BUILD THE INSPECTION BRIEF

Turn expectations
into agreed checks.

Use these areas to define your order requirements. The inspection method and acceptance criteria should be agreed for the selected model and application.

01

Dimensions & bottle connection

Bottle drawing, neck finish, component dimensions and dip tube length.

Agree the drawing, dimensional tolerances and sample fit.

02

Dispensing & operation

Output, spray behavior, priming and actuation requirements for the selected model.

Agree the method and acceptance criteria using the intended liquid.

03

Sealing & compatibility

Bottle assembly, closure or gasket configuration and intended contents.

Confirm the sample conditions and relevant leak or compatibility checks.

04

Appearance & packing

Color, finish, printing, component assembly and carton requirements.

Approve reference samples, artwork and the packing specification.

MANUFACTURING PARTNER EQUIPMENT

Equipment to support
the inspection plan.

The supplied facility inventory includes automatic leak and actuator inspection machines, force gauges, torque testers, environmental chambers and laboratory instruments.

Ask which equipment and methods apply to your configuration and request the relevant records. Confirm any formula compatibility work with actual samples.

See manufacturing facilities →

Inspection equipment inventory

73Automatic leak inspection machines
36Actuator inspection machines
View the equipment list
EquipmentQuantity
Automatic leak inspection machines73
Actuator inspection machines36
Vacuum drying ovens9
Gas chromatograph1
Digital push-pull force gauges3
Temperature and humidity chamber1
Climate chamber1
Double-beam UV-visible spectrophotometer1
Digital torque testers2
Density balance1
Precision pH meter1
Electronic analytical balance1
Constant-temperature drying oven1
Solex pneumatic measuring instrument1
Dry-heat sterilization oven1
Spring tension/compression tester1
Constant-temperature drying oven1
Vertical mold incubator1

Figures describe our manufacturing partner’s supplied equipment inventory. Request applicable test records for your selected product.

BEFORE BULK PRODUCTION

Agree the details at each stage.

01

Agree specifications

Define the component configuration, drawing, appearance and functional requirements.

02

Review actual samples

Check the component with your bottle and intended contents; record the approved reference.

03

Confirm inspection scope

Agree the inspection method, sampling plan, acceptance criteria and required records.

04

Review order documents

Confirm the inspection, packing and shipment documents applicable to your order.

DOCUMENTS FOR YOUR ORDER

Request documents
with the right scope.

Tell us your destination market and the compliance or certification documents you require. Ask for current copies showing the holder, product scope and validity.

Confirm the available material declarations, product-specific test reports and inspection records with your quotation.

Share your documentation requirements →

LET’S REVIEW YOUR REQUIREMENTS

Share your inspection brief.

Send the product or model, bottle drawing, intended contents and the checks or documents you need. We’ll review the scope with you.

[email protected]

Product selection & customization →

Tell us about your project

Share your requirements so we can review the right configuration. You can also email [email protected].

Add purchasing details (optional)

MOQ: 30,000 pcs. Lead time: 35–45 days. Please tell us if you need samples before ordering. Fields marked * are required.