Choose Lotion Pump Output Around the Formula and User Dose
Compare nominal output with measured delivery, recovery and the number of strokes users need.
Read the guide →Image 1 of 1 · Select the image to enlarge.
Review the available specifications below and request a quotation or samples for your packaging project.
PRODUCT DETAILS
| Specification item | Parameter / detail |
|---|---|
| Material | Zinc alloy (pump head and outer shell), 24K gold plating, BPA-free PP plastic internal components, food-grade silicone gaskets |
| Color | Shiny gold (pump head and outer shell); custom finishes like rose gold or antique gold available for bulk orders (MOQ 5,000 units) |
| Dosage | 2.0cc per pump, suitable for various lotion consistencies |
| Minimum order | 30,000 pcs |
| Lead time | 35–45 days |
|
Attribute
|
Advantage
|
Benefit
|
|
24-410 standard thread
|
Fits most standard lotion bottles in the market
|
Eliminates the need for custom bottle molds, reducing packaging costs
|
|
Metal gold finish
|
Adds a touch of luxury and elegance
|
Enhances product shelf appeal, attracting high-end consumers and increasing sales potential
|
|
Eco-friendly materials
|
Zinc alloy is recyclable, PP components are BPA-free
|
Meets the environmental requirements of global markets, enhancing brand reputation as an eco-conscious one
|
BUYER INFORMATION
Include the quantity per model, color or finish in your inquiry.
Share your delivery schedule and selected configuration with our team.
Request samples to check dimensions, appearance and performance with your bottle or assembly.
Tell us your destination and packing requirements. Carton details and freight arrangements are confirmed with your quotation.
Confirm the interface drawing and check samples with your bottle or assembly. Matching a nominal size does not guarantee a compatible fit.
Send the product or model, order quantity, dimensions, intended application, preferred finish and destination market. If a specification is not yet decided, our team can help review it.
MOQ is 30,000 pcs. Lead time is 35–45 days. Include your required delivery schedule and customization details in your inquiry.
BUYER GUIDES
Compare nominal output with measured delivery, recovery and the number of strokes users need.
Read the guide →Use finished components and agreed viewing conditions for colour decisions.
Read the guide →Separate formula-contact claims from complete construction.
Read the guide →Share your requirements so we can review the right configuration. You can also email [email protected].